Concrete driveways & patios
Driveways, patios, walks and pads built on a compacted gravel base with forms and rebar, then poured, finished and joint-cut to last.
Concrete poured the right way
Most driveways that crack early were poured on a thin base with no steel. We dig out, compact a proper gravel base, set forms to grade and lay a rebar grid before any concrete arrives.
After the pour, every slab is floated, broom-finished and saw-cut with control joints, so any cracking stays hidden in a straight line.
- DrivewaysNew drives and extensions
- Patios & walksBackyard patios and front walks
- PadsSheds, AC units and parking
- Dig-out & baseExcavated and plate-compacted
- Forms & rebarSet to grade, steel on chairs
- Finish & jointsBroom finish, saw-cut joints
The part you never see is why it lasts
Most driveways and patios that crack early were poured on a thin base with no steel. Every Yellow Jacket concrete job starts with a compacted base, solid forms and a rebar grid.
Get a concrete quote- Control jointsSaw-cut so any cracking stays in a straight line
- Pour & finishPoured, bull-floated and broom-finished
- Rebar gridSteel set on chairs in the middle of the slab
- FormsSet to grade and pitched so water runs off
- Compacted gravel basePlate-compacted for a solid footing
- Prepared subgradeExcavated, graded and compacted
Watch a driveway get re-poured
Forms drop in, rebar goes down, the concrete pours and gets floated, then the joints are cut and the forms come off.
From quote to finished
Clear pricing, the same crew and no surprises.
Measure & plan
We look at the space, drainage and how you'll use it, then give you a clear price.
Dig out & base
Old concrete and soil come out, then a gravel base is compacted in layers.
Forms & rebar
Forms are set to grade and pitch, and rebar is tied on chairs mid-slab.
Pour, finish & cut
Concrete is poured, floated and broom-finished, then control joints are cut.
Recent concrete jobs
Every photo is from a real Yellow Jacket job. No stock images.



Frequently asked
Don't see your question? Call or text (216) 659-9595.
How long before I can drive on new concrete?
You can usually walk on it after about a day. Vehicles should wait longer, often around a week; we'll tell you exactly when your slab is ready.
Why do you cut control joints?
Concrete shrinks as it cures and can crack. Saw-cut joints guide that cracking into straight lines where you won't notice it.
Do you remove the old driveway?
Yes. Removing and hauling away the old concrete can be included in your quote.
Why use rebar?
Rebar holds the slab together and helps it handle loads and Northeast Ohio's freeze and thaw.
Do you do pavers too?
Yes. We also build paver walkways and paver borders. See Hardscape & Walls.
One crew for the whole property
Book one service or bundle them on a yearly plan.
Thinking about a new driveway or patio?
Send a few details and photos of the space, and we'll get back to you with next steps and a price.
Mowing, striping & edgingLawn Care
Plowing, shoveling & saltSnow Removal
Beds, shrubs & leaf cleanupMulch & Cleanups